← Back to Projects

New Aurora Drive & Nova Way / RBHS Connector

About the Project

ES&S provided planning and design services for two roadways that will provide relief to increased traffic congestion in the Peachtree Commercial District and Nifong Boulevard related to a variety of factors, including: increased traffic at Rock Bridge High School, access management measures that reduced the number of left-turn movements in the area, and ongoing development on the Nifong corridor.  Multiple alternatives were evaluated, with a preferred alternative that includes a new road, Aurora Drive, west of Peachtree Drive; two roundabouts and a short roadway, Nova Way, connecting Aurora at the intersection of Peachtree Drive and Peach Court; and a signalized intersection at Aurora and Nifong.

An extension of this project was proposed by Columbia Public Schools (CPS) to relieve congestion of students arriving and departing the Rock Bridge High School campus to the south.  Approximately 1000-LF of roadway extending to the south of the Aurora Drive roundabout provides a connection to the high school’s north parking lot and the Columbia Area Career Center.  The contract was administered by CPS, with ES&S providing coordination between the two projects and owners.

Market(s)

Location

Columbia, Missouri

Project Owner/Client

City of Columbia, Public Works Dept. | 701 E Broadway | Columbia, MO 65205

Year Completed

2021

Services Provided

  • Boundary & Topographic Survey
  • Subsurface Investigation
  • Roadway Geometric Design
  • Storm Water Drainage & Water Quality Facility Design
  • Erosion Control Plans / SWPPP
  • Right-Of-Way Plan
  • Construction Staking
  • Materials Testing
chevron-down linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram