ES&S provided site design for a two-story addition at the Sedalia Smith Cotton High School that included an expansion of the media center and additional classroom space. The project also included construction of a new secondary gymnasium (pictured above).
Services included topographic survey, grading and drainage design, sidewalks, and modifications to the existing parking lot, a portion of which was used for the gym expansion. Project delivery was provided by a construction manager, Septagon Construction, and design led by Porter, Berendzen Associates, though ES&S contracted directly with the school district.