ES&S has worked closely with Columbia Public Schools (CPS) to provide site evaluations for several new school facilities to accommodate growth and geographical imbalance in the system’s student population. The professional services required for these studies have varied, but generally focus on areas of land-use planning and development, infrastructure services, and significant environmental or regulatory constraints. The scope of investigations often includes such items as:
The information is used to provide data-driven deliverables that have ranged from a letter report, to formal presentations to governing bodies with extensive supporting information including: presentations, graphic displays, and matrices providing weighted criteria showing how various sites under consideration compare against one another. ES&S has directly performed, or provided supporting information to support the District in performing, public and media outreach efforts associated with these evaluations. Below is a list of recent projects offering an example of the services provided by ES&S:
| Year | Project Name | Services Provided |
| 2017 | New SW Middle School Site Evaluation | Phased facility siting study for new 125,000-sf middle school, started with broad screening evaluation of 20+ sites; narrowed to 3 sites for detailed study to gain consensus on preferred location (John Warner Middle School; lower right) |
| 2015 | New SE Elementary School Site Evaluation | Detailed facility siting study (multiple sites) for location of new elementary school in southeast Columbia (Cedar Ridge Elementary; rendering upper-left) |
| 2014 | New SW Elementary School Site Evaluation | Detailed facility siting study (3 sites) for location of new elementary school in SW Columbia (Beulah Ralph Elementary) |
| 2007 | New NE High School Site Evaluation | Facility siting evaluation and development of a site selection evaluation matrix for 315,000-sf campus on 60-acre site, including analysis of new transportation and wastewater system needs (Battle High School; upper left / Battle Elementary) |
| 2007 | New North Elementary School Site Evaluation | Facility siting consultations (2 sites) for new elementary school in north Columbia (Alpha Hart Lewis Elementary) |
Below are examples of deliverables from a recent site evaluation report. Understanding a site – its topography, subsurface characteristics, property and environmental constraints, etc. – as well as how a proposed building and infrastructure might layout on the parcel(s) under consideration, is critical knowledge during facility planning. This information is useful during purchase negotiations, as well as to mitigate or avoid significant construction cost impacts.

