Storm Drainage WQ Improv. @ Wilkes & Eighth

About the Project

As part of the planning and design of a new surface parking lot, ES&S provided complete design services for an underground storm water detention and water quality facility serving the central campus.  This project was a recommendation from the Campus-Wide Stormwater Master Plan, prepared by ES&S in February 2011.  The new facility was designed to account for the cumulative increase in runoff associated with full build out of the College’s facility master plan.  The project included use of ADS’s StormTech® subsurface storm water management system storage, including the use of StormTech Isolator™ Row units to provide for water quality improvement to reach the Level of Service (LS) requirements of the City of Columbia’s revised (2008) storm water management ordinance.  The WQ facility sits under the surface parking lot at the corner of Eighth & Wilkes Streets (right)

Market(s)

Location

Columbia, Missouri

Project Owner/Client

Columbia College 1001 Rogers Street Columbia, MO 65216

Year Completed

2011

Services Provided

  • Boundary, Topographic & Construction Surveys
  • Site Layout, Grading & Utility Plan
  • Permit Application Preparation
  • Hydrologic / Hydraulic Analysis
  • Storm Water Detention & Water Quality Facility Design
  • Erosion & Sediment Control Plans
  • Foundation & Pavement Design Recommendations