ES&S provided consulting and design services for the closure of two lagoons serving a homeowners’ association. An Engineering Report was developed outlining the closure plans as well as the conceptual design of relief sewers to connect to the BCRSD system. Final design services included over 3000-LF of 8-inch PVC gravity sewer to relieve the two existing lagoons, two bores under I-70, and coordination of a crossing under a high-pressure petroleum pipeline. Application to the State Revolving Loan Fund were included as part of the submittal to the client.
Pictured above is one of the two existing lagoons to be relieved (left) and the same property after lagoon closure (right)